Applications
- Optimisation of electricity purchase price: optimised operation evaluated at market prices.
- Reduction of peak loads to reduce grid utilisation.
- Atypical grid utilisation: seasonal within the peak load time windows.
- Minute reserve as additional revenue potential for switching operations Reaction < 15 minutes.
- Secondary reserve as additional revenue potential for switching actions Reaction < 5 minutes.
- ABLAV immediate / quickly disconnectable loads with a response time in real time or < 15 minutes (monthly tender).
- Balancing of balancing groups